« Back to Projects

Please download the latest Adobe Flash Player to use our interactive map.

The Dallas Zoo River renovation included a complete overhaul of the equipment that powers the half million gallon zoo river. One of the challenges was the filtration. Sunbelt installed a four filter system with fully automatic backwash to handle the heavy load from the animals and the foliage.

Sunbelt Scope of Work:

  • Pool piping and mechanical
  • Nemato National High Rate Sand filters with fully automatic backwash
  • BECSsys Bachwash controllers
  • Pulsar 4 Chlorination system
  • Pumps from ITT Marlow – 50 HP feature pumps

Owner: Dallas Zoo

Owner Representative: Don Burns

General Contractor: Metalman Design Build Corp