« Back to Projects
Please download the latest Adobe Flash Player to use our interactive map.
The Dallas Zoo River renovation included a complete overhaul of the equipment that powers the half million gallon zoo river. One of the challenges was the filtration. Sunbelt installed a four filter system with fully automatic backwash to handle the heavy load from the animals and the foliage.
Sunbelt Scope of Work:
- Pool piping and mechanical
- Nemato National High Rate Sand filters with fully automatic backwash
- BECSsys Bachwash controllers
- Pulsar 4 Chlorination system
- Pumps from ITT Marlow – 50 HP feature pumps
Owner: Dallas Zoo
Owner Representative: Don Burns
General Contractor: Metalman Design Build Corp





