« Back to Projects
Southern Trace Country Club — Shreveport, LA
Southern Trace Country Club
This was an emergency, fast track renovation of a pool that was leaking so badly that it could not be opened. With less than six weeks of time, Sunbelt was hired to fast track and repipe the pools and replace much of the equipment. The pool opened on time and the leaky pool now holds water.
Sunbelt Scope of Work:
- Replace all pool piping
- Reinstall pool equipment
Owner: Club Corp
Aquatic Engineer: C.T. Brannon Corp





